QUELEN

APPLICATION

Retrofit without removing every wall.

A phased hotel renovation needs a room control route that fits the existing wiring, the floor schedule and the operator's downtime limit.

PROJECT CHECKLIST

What to confirm before the model list is fixed.

  • Map the existing wiring and room types before choosing models.
  • Phase floors and keep a documented model list per room type.
  • Confirm the sample room and approval sequence before the full rollout.
  • Keep spare modules and connector sets in the project plan.

These are project questions, not guaranteed performance claims. The final model, documents and quotation depend on the room design and target market.