Board assembly
SMT, through-hole and board-level test are planned around the PCBA family, with model identity kept through the process.
QUELEN / Core Advantages / 19
Two production sites with a single allocation plan: Yueqing for switches and wall modules, Zhongshan for smart control and scene PCBA.
2 production sites · 3 inspection gates · 15–25 days standard lead time
MANUFACTURING / TWO SITES
A project is not assembled from one address. Each product is assigned to the site that has the right process, then both sites are scheduled against the same delivery date and document set.

SMT, through-hole and board-level test are planned around the PCBA family, with model identity kept through the process.
Wall modules and finished units are assembled against the approved drawing, panel fit and terminal schedule.
Functional checks, aging where required and OQC release are recorded before packing and shipment.
Send the room schedule, target market and the released QL code or validation model you are planning with. The team replies with the model questions, document set and sample plan.
QUELEN / LEGAL
Last updated: 24 November 2026
ISO 9001:2015 · Certificate 117 25 QU 0186-08 R1S · Scope: manufacturing of electronic circuit board · Valid 2025-09-05 → 2028-09-04. Issued by Shanghai Inger Certification Assessment Co., Ltd.