Partner Process

A gated path from first brief to repeat supply: NDA, technical screen, sample approval, production release and change control.

5 gates · sample before batch · approved record before repeat

Overview

A gated path from first brief to repeat supply, with a sample approval before production.

PARTNER PROCESS

Five gates from NDA to repeat supply.

Each gate produces a document and a decision. The process is designed to prevent a sample conversation from turning into an unapproved production order.

  • Gate 1 confirms the project fit, target market and confidentiality scope.
  • Gate 2 fixes the BOM, mechanical envelope, firmware scope and test plan.
  • Gate 3 approves the sample; Gate 4 releases production; Gate 5 controls repeat orders and changes.
  • A gate is not skipped because of a deadline. The missing input becomes the next action.

Read the policy ↗

Capabilities

Brief quality

A useful brief includes the room or device function, target market, volume, drawings and the compliance target.

Technical screen

The board, firmware, mechanical fit and test method are reviewed together before a sample is quoted.

Approval record

Sample approval, production release and change requests are kept against one project record.

Process

01

Gate 1 / Fit and NDA — Confirm the partner type, project scope and confidentiality requirement.

02

Gate 2 / Technical file — Fix the drawing, BOM, interface, test plan and target compliance.

03

Gate 3 / Sample approval — Check fit, function, label and packing; record the approved sample.

04

Gate 4 / Production — Release the batch against the approved record, then close with Gate 5 change control.

What each gate produces.

A gate is a decision with a document. This is the minimum record for a controlled OEM project.

GateOutputOwnerBuyer input
01 Fit / NDAProject fit note and NDASales + legalCompany and project brief
02 TechnicalDrawing, BOM and test planEngineeringSpecification and target market
03 SampleApproved sample recordQuality + buyerFit, function and label approval
04 ProductionReleased batch recordProduction + OQCPurchase order and packing brief

FAQ

Can we skip the sample gate?

No for a new board or a changed mechanical envelope. A repeat order against an approved record follows the existing file.

How long does each gate take?

Gate 1 and 2 depend on how complete the brief is. Sample and production timing are quoted after the technical screen, not before.

Who approves the sample?

The buyer confirms fit, function, label and packaging; QUELEN records the approved sample and keeps it as the production reference.

Can production start before paperwork is complete?

No. The production release requires the approved record, purchase order and packing instruction.

How are changes handled after Gate 4?

Through Gate 5: impact note, re-quote where needed and a revised approval before the change enters a batch.

Start a gated OEM review.

Send the product type, target market, volume and the documents you can share. We reply with the gate that applies and the missing inputs.