Centralized wired guestroom control for new-build and major renovation projects that can plan cabling and controllers together.
New-build first · structured cabling · centralized room logic
Overview
Centralized controllers and structured cabling for new-build hotels and major renovations.
SOLUTION / WIRED
Deterministic control for new-build rooms.
A wired room is planned with the cable schedule, not after it. The controller, field devices and riser are designed as one package, which gives predictable commissioning and simpler fault isolation.
- Structured cabling connects scene panels, sensors, thermostats and status boards to a room controller.
- Controllers can sit at room or floor level; the location changes maintenance access and cable routing.
- Wired control suits new-build and major renovation where ceilings, risers and wall boxes are still open.
- The cable schedule, terminal map and controller I/O are frozen before the sample room is installed.

Room package
A wired room package is built from the cable schedule backward, so each zone has a fixed terminal and controller address.
Entry
Card power, status and door scene
- QL-KEY-002 — Card-power board
- QL-IND-001 — Room-status board
- QL-SOS-001 — Emergency indicator
Bedside
Scene panel and guest interfaces
- QL-SCN-003-R4 — Scene board
- i11 USB module — Charging
- i10 phone module — Hands-free phone
Climate
Thermostat and load control
- QL-THM-003 — Thermostat
- QL-DIM-400W-001 — Dimmer
- QL-FAN-300W-001 — Fan-speed module
Safety
Sensing and emergency call
- QL-PIR-001 — PIR board
- QL-SOS-002 — Relay board
- QL-STL-002 — Floor-light board
Architecture
Wired control is a chain of physical interfaces: field device, controller and building head-end. Each link needs its own drawing.
Wall devices
Panels, thermostats, sensors, card power and status boards.
Room controller
Relay, dimming and sensor I/O in a room or floor location.
Building network
Front desk or BMS through the agreed wired interface.
Wired new-build — what to fix early.
The model list follows the cable schedule. These decisions should be closed before the first sample room is ordered.
| Layer | Typical hardware | Best fit | Confirm before quote |
|---|---|---|---|
| Room controller | i10 6–12 relay controller | New-build rooms | I/O count and mounting location |
| Field wiring | Structured cable to each zone | Open ceilings and risers | Cable type, length and terminal map |
| Climate | QL-THM-003 + dimmer / fan module | Guestroom HVAC and lighting | Load type and valve arrangement |
| Head-end | Front desk or BMS interface | Central operations | Protocol and alarm mapping |
FAQ
Is wired control suitable for a retrofit?
Only when the walls, ceilings or risers can accept the cable schedule. For occupied rooms, wireless or a hybrid package is usually reviewed first.
Where should the room controller be installed?
Room-level and floor-level locations are both possible. The choice depends on maintenance access, cable length and the head-end architecture.
Do you provide the cable schedule?
Yes, after the room matrix and controller selection are agreed. The schedule lists terminal, device and zone; it is part of the project document pack.
Can classic modules be used in a wired room?
Yes, where the voltage, load and control interface match. The room schedule marks which classic parts can be reused and which need a controller interface.
What is the typical lead time?
Standard lead time is 15–25 days after sample and document approval. Model-specific lead times are stated on released model records; larger or mixed batches are scheduled per project.
Start a project review
Send the room schedule, target market and the released QL code or validation model you are planning with. The team replies with the model questions, document set and sample plan.